GA Terminal EA-Public Release

The Chelan Douglas Regional Port Authority (CDRPA) and the Federal Aviation Administration announce that a Draft Environmental Assessment has been prepared in accordance with the National Environmental Policy Act of 1969 guidelines to analyze the potential environmental impacts of proposed airfield improvements to the Pangborn Memorial Airport (Airport). The CDRPA proposes to rehabilitate and adaptively re-use the Airport’s existing General Aviation (GA) Terminal building to address known building deficiencies and potentially hazardous conditions in order to meet the needs of existing and future users. The files below contain the Draft EA, the associated appendices, and legal notice informing the public of the 30-day Draft EA public comment period.

GA Terminal EA Appendices

   Appendix A – ALP (abbreviated)

   Appendix B – Agency Correspondence

   Appendix C – Cultural Resource Survey

   Appendix D – IDP

   Appendix E – Section 4(f) Evaluation

   Appendix F – Phase 1 ESA

   Appendix G – Public Engagement Summary

   Appendix H – List of Preparers

-Pangborn GA Terminal EA – Public Comment

-Pangborn GA  Terminal EA Draft Ch. 1-5 1-12-24